Waterways Decor

Waterways Decor

Bathroom Remodeling·9 Lake St, Monroe, NY 10950
4.9
4.9
(0)
This is an unclaimed listing. Information may be incomplete.

About Waterways Decor

Waterways Decor is a bathroom remodeling contractor serving Monroe, NY and the surrounding area. Many homes in Monroe were built around 1975 and commonly need 1970s colonial and split-level homes with original windows and insulation needing energy upgrades. Contact them directly for a free estimate on your bathroom remodeling project.

Listing last verified March 2026. Information sourced from public records and Google Business data.

Bathroom Remodeling Services

bathroom remodeling services offered in Monroe:

  • Bathroom Supply Store
  • Full bathroom renovation
  • Shower and tub installation or conversion
  • Tile work (floors, walls, showers)
  • Vanity and fixture installation
  • Bathroom waterproofing and drainage
  • Accessibility modifications

Bathroom Remodeling in Monroe — FAQ

How much does a bathroom remodel cost in Monroe?

Bathroom remodels in Monroe average $35,000, ranging from $24,000-$48,000 per project. Walk-in shower conversions and heated tile floors are growing in popularity across the county. Homes on well water in Warwick and Pine Bush may need water treatment upgrades as part of a bathroom remodel.

How long does a bathroom remodel take in Monroe?

Most bathroom remodels in Monroe take 3-6 weeks. A simple refresh (new fixtures, paint, vanity) can be done in 1-2 weeks, while a full gut renovation takes 4-8 weeks.

What bathroom upgrades are popular in Monroe?

In Monroe, where homes average $420,000 and were typically built around 1975, popular upgrades include walk-in showers replacing tubs, heated tile floors, double vanities, and frameless glass enclosures. These updates appeal to buyers and boost resale value.

Do I need a permit for a bathroom remodel in Monroe?

If your bathroom remodel involves moving plumbing, adding circuits, or changing the layout, you'll need a permit from the Town of Monroe Building Department ((845) 783-1900). Cosmetic-only work -- new tile, vanity swap, paint -- typically doesn't require one. Your contractor should know the local requirements.

Before Hiring a Bathroom Remodeling Pro in Monroe

Use this checklist to vet contractors before signing a contract.

  • Ask about waterproofing method for the shower area

    Proper waterproofing (Schluter Kerdi, RedGard, or equivalent) behind tile is critical. Grout alone is not waterproof. Failed waterproofing leads to mold and structural damage.

  • Confirm they will install a properly sized exhaust fan

    Bathrooms need at least 1 CFM per square foot (minimum 50 CFM). An undersized fan leads to moisture problems and mold growth.

  • Ask whether they handle plumbing rough-in or subcontract it

    Moving plumbing for a new layout is the most expensive part of a bathroom remodel. Know whether the plumber is in-house or a sub.

  • Verify Home Improvement Contractor license with your municipality

    New York counties require Home Improvement Contractor registration. Check with your local clerk's office or building department.

  • Confirm general liability insurance and workers' compensation coverage

    Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.

  • Get 2-3 written estimates that itemize labor, materials, and timeline

    Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.

  • Check permit requirements with Town of Monroe Building Department ((845) 783-1900)

    Contact town hall for permit requirements. Monroe NY is distinct from Monroe CT.

  • Ask for 3 recent local references and actually call them

    Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?

Verify contractor credentials: NY Division of Licensing Services

Best Time to Hire a Bathroom Remodeling Pro in New York

Seasonal timing guide for the Northeast (CT/NY metro area).

SpringMar - May
Best time

Start your project now to finish before summer. Open windows for ventilation during tile adhesive and grout curing. Contractors are booking up — call early.

SummerJun - Aug
Good time

Peak demand. Tile adhesive cures well in warm conditions. Downside: being without a bathroom during summer heat. Plan for a portable option if it is your only bathroom.

FallSep - Nov
Best time

Good availability as contractors pivot from outdoor to indoor work. Finish before holiday guests arrive. Interior work is comfortable in fall temperatures.

WinterDec - Feb
Good time

Interior work is weather-independent. Contractors are least busy and may negotiate on price. Being without a bathroom in winter is uncomfortable but manageable for a 3-4 week project.

Free Quotes

From verified contractors

Your info is only shared with contractors you choose to contact.

By submitting, you agree to receive calls/texts from contractors

Is this your business?

Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.

Claim This Listing