Venezia Marble - Showroom

Venezia Marble - Showroom

Kitchen Remodeling·197 Ethan Allen Highway, Ridgefield, Connecticut 06877
4.9
4.9
(102)
This is an unclaimed listing. Information may be incomplete.

About Venezia Marble - Showroom

Venezia Marble is a family-owned company specializing in the fabrication and installation of natural stone and quartz surfaces. Since 2008, they have proudly served Connecticut and New York, offering premium materials like granite, marble, quartzite, soapstone, and quartz from top brands.

Listing last verified March 2026. Information sourced from public records and Google Business data.

Kitchen Remodeling Services

Home Goods StoreGeneral ContractorStoreCustom Quartz & Granite CountertopsFabrication and Installation of Natural Stone and Quartz SurfacesGranite, Marble, Quartzite, Soapstone, and Quartz CountertopsStone Care Products

kitchen remodeling services offered in Ridgefield:

  • Home_goods_store
  • General_contractor
  • Store
  • Custom Quartz & Granite Countertops
  • Fabrication and Installation of Natural Stone and Quartz Surfaces
  • Granite, Marble, Quartzite, Soapstone, and Quartz Countertops
  • Stone Care Products
  • Full kitchen renovation and design

Kitchen Remodeling in Ridgefield — FAQ

How much does a kitchen remodel cost in Ridgefield?

Kitchen remodels in Ridgefield average $72,000, ranging from $50,000-$110,000 per project. Fully custom cabinets and imported materials are standard. Mid-grade kitchens average $67,000 for 200 sq ft spaces.

How long does a kitchen remodel take in Ridgefield?

A typical kitchen remodel in Ridgefield takes 8-12 weeks. Complex projects with custom cabinetry or structural changes can take 16-20 weeks. Plan for cabinet lead times of 6-10 weeks.

Do I need permits for a kitchen remodel in Ridgefield?

Most kitchen remodels in Ridgefield require permits from the Town of Ridgefield Building Department ((203) 431-2743), especially when changing plumbing, electrical, or removing walls. Ridgefield's Colonial-style homes, built around 1968, often benefit from opening up kitchens to modern open-concept layouts.

What kitchen layout works best for Ridgefield's Colonial homes?

Colonial homes in Ridgefield typically have enclosed, galley-style kitchens. Homes from the 1968s era usually have load-bearing walls separating the kitchen from dining areas, so opening up the floor plan requires an engineer's sign-off and a properly sized header beam ($2,000-$5,000 for the structural work alone). Popular upgrades include quartz countertops ($50-$120/sqft installed), soft-close cabinetry, and under-cabinet LED lighting.

Before Hiring a Kitchen Remodeling Pro in Ridgefield

Use this checklist to vet contractors before signing a contract.

  • Ask whether they handle design in-house or subcontract it

    Some kitchen remodelers are also designers. Others outsource design, which adds a layer of coordination and potential miscommunication.

  • Confirm they will create a detailed layout before ordering cabinets

    Cabinet lead times are 4-8 weeks. Measuring errors are expensive. A professional layout should include appliance dimensions and clearances.

  • Ask about material allowances versus fixed specifications

    Bids with vague 'allowances' for countertops or fixtures can balloon. Get specific product selections and prices in the contract.

  • Verify plumbing and electrical subcontractors are licensed

    Kitchen remodels involve gas lines, electrical circuits, and plumbing. These must be done by licensed tradespeople, even if the GC manages the project.

  • Verify HIC registration with the CT Department of Consumer Protection

    Connecticut requires all home improvement contractors to register with the DCP. Verify at portal.ct.gov/DCP.

  • Confirm general liability insurance and workers' compensation coverage

    Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.

  • Get 2-3 written estimates that itemize labor, materials, and timeline

    Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.

  • Check permit requirements with Town of Ridgefield Building Department ((203) 431-2743)

    Contact town hall for permit requirements. Historic district properties require Architectural Review Board approval for exterior changes.

  • Ask for 3 recent local references and actually call them

    Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?

Verify contractor credentials: CT Dept. of Consumer Protection

Best Time to Hire a Kitchen Remodeling Pro in Connecticut

Seasonal timing guide for the Northeast (CT/NY metro area).

SpringMar - May
Best time

Start now to finish before summer entertaining season. Cabinet lead times are 4-8 weeks, so order in March for a May start. Countertop fabricators are less backed up than summer.

SummerJun - Aug
Good time

Peak demand season with longer wait times. Living without a kitchen is more tolerable when you can grill outside. Expect 8-12 week timelines for full remodels.

FallSep - Nov
Best time

Good time to start — aim to finish before the holidays. Contractors are wrapping outdoor projects and have more availability for interior work.

WinterDec - Feb
Good time

Contractors are hungriest for work — best prices and fastest starts. Downside: living without a kitchen in winter is less comfortable. January is ideal for planning and ordering materials.

Free Quotes

From verified contractors

Your info is only shared with contractors you choose to contact.

By submitting, you agree to receive calls/texts from contractors

Credentials

17+ Years

Is this your business?

Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.

Claim This Listing