Top Drawer Luxury Home Builder

Top Drawer Luxury Home Builder

Kitchen Remodeling·719 Main Street, New Rochelle, New York 10801
4.5
4.5
(27)
This is an unclaimed listing. Information may be incomplete.

About Top Drawer Luxury Home Builder

Top Drawer is a luxury home builder that combines construction expertise with in-house cabinetry craftsmanship. They focus on precision, accountability, and integrity in their projects, whether it's a single room renovation or a full-scale residential development.

Listing last verified March 2026. Information sourced from public records and Google Business data.

Kitchen Remodeling Services

General ContractorHome Goods StoreStoreBathroom designKitchen remodelingMillworkConstruction/RenovationCommercial projects

kitchen remodeling services offered in New Rochelle:

  • General_contractor
  • Home_goods_store
  • Store
  • Bathroom Design
  • Kitchen Remodeling
  • Millwork
  • Construction/renovation
  • Commercial Projects

Kitchen Remodeling in New Rochelle — FAQ

How much does a kitchen remodel cost in New Rochelle?

Kitchen remodels in New Rochelle average $62,000, ranging from $45,000-$85,000 per project. Custom cabinetry and imported materials are standard in Westchester kitchens. Expect $335+ per sq ft for mid-grade work.

How long does a kitchen remodel take in New Rochelle?

A typical kitchen remodel in New Rochelle takes 8-12 weeks. Complex projects with custom cabinetry or structural changes can take 16-20 weeks. Plan for cabinet lead times of 6-10 weeks.

Do I need permits for a kitchen remodel in New Rochelle?

Most kitchen remodels in New Rochelle require permits from the City of New Rochelle Building Department ((914) 654-2035), especially when changing plumbing, electrical, or removing walls. New Rochelle's Colonial-style homes, built around 1954, often benefit from opening up kitchens to modern open-concept layouts.

What kitchen layout works best for New Rochelle's Colonial homes?

Colonial homes in New Rochelle typically have enclosed, galley-style kitchens. Homes from the 1954s era usually have load-bearing walls separating the kitchen from dining areas, so opening up the floor plan requires an engineer's sign-off and a properly sized header beam ($2,000-$5,000 for the structural work alone). Popular upgrades include quartz countertops ($50-$120/sqft installed), soft-close cabinetry, and under-cabinet LED lighting.

Before Hiring a Kitchen Remodeling Pro in New Rochelle

Use this checklist to vet contractors before signing a contract.

  • Ask whether they handle design in-house or subcontract it

    Some kitchen remodelers are also designers. Others outsource design, which adds a layer of coordination and potential miscommunication.

  • Confirm they will create a detailed layout before ordering cabinets

    Cabinet lead times are 4-8 weeks. Measuring errors are expensive. A professional layout should include appliance dimensions and clearances.

  • Ask about material allowances versus fixed specifications

    Bids with vague 'allowances' for countertops or fixtures can balloon. Get specific product selections and prices in the contract.

  • Verify plumbing and electrical subcontractors are licensed

    Kitchen remodels involve gas lines, electrical circuits, and plumbing. These must be done by licensed tradespeople, even if the GC manages the project.

  • Verify Home Improvement Contractor license with your municipality

    New York counties require Home Improvement Contractor registration. Check with your local clerk's office or building department.

  • Confirm general liability insurance and workers' compensation coverage

    Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.

  • Get 2-3 written estimates that itemize labor, materials, and timeline

    Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.

  • Check permit requirements with City of New Rochelle Building Department ((914) 654-2035)

    Located at City Hall, 515 North Ave. Online permit system available at newrochelleny.gov.

  • Ask for 3 recent local references and actually call them

    Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?

Verify contractor credentials: NY Division of Licensing Services

Best Time to Hire a Kitchen Remodeling Pro in New York

Seasonal timing guide for the Northeast (CT/NY metro area).

SpringMar - May
Best time

Start now to finish before summer entertaining season. Cabinet lead times are 4-8 weeks, so order in March for a May start. Countertop fabricators are less backed up than summer.

SummerJun - Aug
Good time

Peak demand season with longer wait times. Living without a kitchen is more tolerable when you can grill outside. Expect 8-12 week timelines for full remodels.

FallSep - Nov
Best time

Good time to start — aim to finish before the holidays. Contractors are wrapping outdoor projects and have more availability for interior work.

WinterDec - Feb
Good time

Contractors are hungriest for work — best prices and fastest starts. Downside: living without a kitchen in winter is less comfortable. January is ideal for planning and ordering materials.

Free Quotes

From verified contractors

Your info is only shared with contractors you choose to contact.

By submitting, you agree to receive calls/texts from contractors

Is this your business?

Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.

Claim This Listing