Sleepy Hollow Kitchens and Baths, Inc.

Sleepy Hollow Kitchens and Baths, Inc.

Kitchen Remodeling·361 North Broadway, Sleepy Hollow, New York 10591
5.0
5.0
(2)
This is an unclaimed listing. Information may be incomplete.

About Sleepy Hollow Kitchens and Baths, Inc.

Sleepy Hollow Kitchens and Baths is a premier kitchen cabinetry showroom located in the heart of Sleepy Hollow, NY in Westchester County. They offer a full range of cabinetry styles to suit all home designs, as well as beautiful options for countertops, tile, backsplash materials, and hardware.

Listing last verified March 2026. Information sourced from public records and Google Business data.

Kitchen Remodeling Services

Furniture StoreHome Improvement StoreHome Goods StoreStoreGeneral ContractorKitchen cabinetryBathroom cabinetryBuilt-in cabinetryCountertop installationTile and backsplash installationHardware installation

kitchen remodeling services offered in Sleepy Hollow:

  • Furniture_store
  • Home_improvement_store
  • Home_goods_store
  • Store
  • General_contractor
  • Kitchen Cabinetry
  • Bathroom Cabinetry
  • Built-in Cabinetry

Kitchen Remodeling in Sleepy Hollow — FAQ

How much does a kitchen remodel cost in Sleepy Hollow?

Kitchen remodels in Sleepy Hollow average $62,000, ranging from $45,000-$85,000 per project. Custom cabinetry and imported materials are standard in Westchester kitchens. Expect $335+ per sq ft for mid-grade work.

How long does a kitchen remodel take in Sleepy Hollow?

A typical kitchen remodel in Sleepy Hollow takes 8-12 weeks. Complex projects with custom cabinetry or structural changes can take 16-20 weeks. Plan for cabinet lead times of 6-10 weeks.

Do I need permits for a kitchen remodel in Sleepy Hollow?

Most kitchen remodels in Sleepy Hollow require permits from the Village of Sleepy Hollow Building Department ((914) 366-5116), especially when changing plumbing, electrical, or removing walls. Sleepy Hollow's Colonial-style homes, built around 1952, often benefit from opening up kitchens to modern open-concept layouts.

What kitchen layout works best for Sleepy Hollow's Colonial homes?

Colonial homes in Sleepy Hollow typically have enclosed, galley-style kitchens. Homes from the 1952s era usually have load-bearing walls separating the kitchen from dining areas, so opening up the floor plan requires an engineer's sign-off and a properly sized header beam ($2,000-$5,000 for the structural work alone). Popular upgrades include quartz countertops ($50-$120/sqft installed), soft-close cabinetry, and under-cabinet LED lighting.

Before Hiring a Kitchen Remodeling Pro in Sleepy Hollow

Use this checklist to vet contractors before signing a contract.

  • Ask whether they handle design in-house or subcontract it

    Some kitchen remodelers are also designers. Others outsource design, which adds a layer of coordination and potential miscommunication.

  • Confirm they will create a detailed layout before ordering cabinets

    Cabinet lead times are 4-8 weeks. Measuring errors are expensive. A professional layout should include appliance dimensions and clearances.

  • Ask about material allowances versus fixed specifications

    Bids with vague 'allowances' for countertops or fixtures can balloon. Get specific product selections and prices in the contract.

  • Verify plumbing and electrical subcontractors are licensed

    Kitchen remodels involve gas lines, electrical circuits, and plumbing. These must be done by licensed tradespeople, even if the GC manages the project.

  • Verify Home Improvement Contractor license with your municipality

    New York counties require Home Improvement Contractor registration. Check with your local clerk's office or building department.

  • Confirm general liability insurance and workers' compensation coverage

    Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.

  • Get 2-3 written estimates that itemize labor, materials, and timeline

    Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.

  • Check permit requirements with Village of Sleepy Hollow Building Department ((914) 366-5116)

    Contact village hall for permit requirements. Hudson River waterfront properties may fall in FEMA flood zones.

  • Ask for 3 recent local references and actually call them

    Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?

Verify contractor credentials: NY Division of Licensing Services

Best Time to Hire a Kitchen Remodeling Pro in New York

Seasonal timing guide for the Northeast (CT/NY metro area).

SpringMar - May
Best time

Start now to finish before summer entertaining season. Cabinet lead times are 4-8 weeks, so order in March for a May start. Countertop fabricators are less backed up than summer.

SummerJun - Aug
Good time

Peak demand season with longer wait times. Living without a kitchen is more tolerable when you can grill outside. Expect 8-12 week timelines for full remodels.

FallSep - Nov
Best time

Good time to start — aim to finish before the holidays. Contractors are wrapping outdoor projects and have more availability for interior work.

WinterDec - Feb
Good time

Contractors are hungriest for work — best prices and fastest starts. Downside: living without a kitchen in winter is less comfortable. January is ideal for planning and ordering materials.

Free Quotes

From verified contractors

Your info is only shared with contractors you choose to contact.

By submitting, you agree to receive calls/texts from contractors

Is this your business?

Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.

Claim This Listing