S&M Works Llc

S&M Works Llc

Bathroom Remodeling·218 South 3rd Avenue, Mount Vernon, New York 10550
5.0
5.0
(4)
This is an unclaimed listing. Information may be incomplete.

About S&M Works Llc

S&M Works LLC specializes in bathroom remodeling for homeowners in Mount Vernon. Their team transforms bathrooms with quality craftsmanship and attention to detail.

Listing last verified March 2026. Information sourced from public records and Google Business data.

Bathroom Remodeling Services

bathroom remodeling services offered in Mount Vernon:

  • Full bathroom renovation
  • Shower and tub installation or conversion
  • Tile work (floors, walls, showers)
  • Vanity and fixture installation
  • Bathroom waterproofing and drainage
  • Accessibility modifications

Bathroom Remodeling in Mount Vernon — FAQ

How much does a bathroom remodel cost in Mount Vernon?

Bathroom remodels in Mount Vernon average $52,000, ranging from $38,000-$68,000 per project. Plumbing relocations and custom tile work drive costs. Historic homes often require structural modifications.

How long does a bathroom remodel take in Mount Vernon?

Most bathroom remodels in Mount Vernon take 3-6 weeks. A simple refresh (new fixtures, paint, vanity) can be done in 1-2 weeks, while a full gut renovation takes 4-8 weeks.

What bathroom upgrades are popular in Mount Vernon?

In Mount Vernon, where homes average $520,000 and were typically built around 1952, popular upgrades include walk-in showers replacing tubs, heated tile floors, double vanities, and frameless glass enclosures. Homes from this era often have galvanized or cast-iron drain pipes that should be replaced while walls are open -- doing it during the remodel saves thousands compared to fixing it later. These updates appeal to buyers and boost resale value.

Do I need a permit for a bathroom remodel in Mount Vernon?

If your bathroom remodel involves moving plumbing, adding circuits, or changing the layout, you'll need a permit from the Mount Vernon Department of Buildings ((914) 665-2483). Cosmetic-only work -- new tile, vanity swap, paint -- typically doesn't require one. Your contractor should know the local requirements.

Before Hiring a Bathroom Remodeling Pro in Mount Vernon

Use this checklist to vet contractors before signing a contract.

  • Ask about waterproofing method for the shower area

    Proper waterproofing (Schluter Kerdi, RedGard, or equivalent) behind tile is critical. Grout alone is not waterproof. Failed waterproofing leads to mold and structural damage.

  • Confirm they will install a properly sized exhaust fan

    Bathrooms need at least 1 CFM per square foot (minimum 50 CFM). An undersized fan leads to moisture problems and mold growth.

  • Ask whether they handle plumbing rough-in or subcontract it

    Moving plumbing for a new layout is the most expensive part of a bathroom remodel. Know whether the plumber is in-house or a sub.

  • Verify Home Improvement Contractor license with your municipality

    New York counties require Home Improvement Contractor registration. Check with your local clerk's office or building department.

  • Confirm general liability insurance and workers' compensation coverage

    Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.

  • Get 2-3 written estimates that itemize labor, materials, and timeline

    Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.

  • Check permit requirements with Mount Vernon Department of Buildings ((914) 665-2483)

    Located at City Hall, 1 Roosevelt Sq, Room 210. Open Mon/Tue/Thu/Fri 9–3, Wed closed to public. Fees: $10/$1,000 for 1-2 family, $15/$1,000 for others.

  • Ask for 3 recent local references and actually call them

    Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?

Verify contractor credentials: NY Division of Licensing Services

Best Time to Hire a Bathroom Remodeling Pro in New York

Seasonal timing guide for the Northeast (CT/NY metro area).

SpringMar - May
Best time

Start your project now to finish before summer. Open windows for ventilation during tile adhesive and grout curing. Contractors are booking up — call early.

SummerJun - Aug
Good time

Peak demand. Tile adhesive cures well in warm conditions. Downside: being without a bathroom during summer heat. Plan for a portable option if it is your only bathroom.

FallSep - Nov
Best time

Good availability as contractors pivot from outdoor to indoor work. Finish before holiday guests arrive. Interior work is comfortable in fall temperatures.

WinterDec - Feb
Good time

Interior work is weather-independent. Contractors are least busy and may negotiate on price. Being without a bathroom in winter is uncomfortable but manageable for a 3-4 week project.

Free Quotes

From verified contractors

Your info is only shared with contractors you choose to contact.

By submitting, you agree to receive calls/texts from contractors

Is this your business?

Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.

Claim This Listing