RAJ KITCHEN & BATH LLC
About RAJ KITCHEN & BATH LLC
RAJ Kitchen & Bath is a Westchester design-build firm that specializes in kitchen, bathroom, and full-home renovations. They take a thoughtful approach to understanding how their clients live and create personalized, intentional spaces that are built to last.
Listing last verified March 2026. Information sourced from public records and Google Business data.
Kitchen Remodeling Services
kitchen remodeling services offered in White Plains:
- General_contractor
- Home_goods_store
- Store
- Kitchen Remodeling
- Bathroom Remodeling
- Full-home Renovations
- Full kitchen renovation and design
- Cabinet installation and refacing
Kitchen Remodeling in White Plains — FAQ
How much does a kitchen remodel cost in White Plains?
Kitchen remodels in White Plains average $62,000, ranging from $45,000-$85,000 per project. Custom cabinetry and imported materials are standard in Westchester kitchens. Expect $335+ per sq ft for mid-grade work.
How long does a kitchen remodel take in White Plains?
A typical kitchen remodel in White Plains takes 8-12 weeks. Complex projects with custom cabinetry or structural changes can take 16-20 weeks. Plan for cabinet lead times of 6-10 weeks.
Do I need permits for a kitchen remodel in White Plains?
Most kitchen remodels in White Plains require permits from the City of White Plains Building Department ((914) 422-1269), especially when changing plumbing, electrical, or removing walls. White Plains's Colonial-style homes, built around 1956, often benefit from opening up kitchens to modern open-concept layouts.
What kitchen layout works best for White Plains's Colonial homes?
Colonial homes in White Plains typically have enclosed, galley-style kitchens. Homes from the 1956s era usually have load-bearing walls separating the kitchen from dining areas, so opening up the floor plan requires an engineer's sign-off and a properly sized header beam ($2,000-$5,000 for the structural work alone). Popular upgrades include quartz countertops ($50-$120/sqft installed), soft-close cabinetry, and under-cabinet LED lighting.
Before Hiring a Kitchen Remodeling Pro in White Plains
Use this checklist to vet contractors before signing a contract.
Ask whether they handle design in-house or subcontract it
Some kitchen remodelers are also designers. Others outsource design, which adds a layer of coordination and potential miscommunication.
Confirm they will create a detailed layout before ordering cabinets
Cabinet lead times are 4-8 weeks. Measuring errors are expensive. A professional layout should include appliance dimensions and clearances.
Ask about material allowances versus fixed specifications
Bids with vague 'allowances' for countertops or fixtures can balloon. Get specific product selections and prices in the contract.
Verify plumbing and electrical subcontractors are licensed
Kitchen remodels involve gas lines, electrical circuits, and plumbing. These must be done by licensed tradespeople, even if the GC manages the project.
Verify Home Improvement Contractor license with your municipality
New York counties require Home Improvement Contractor registration. Check with your local clerk's office or building department.
Confirm general liability insurance and workers' compensation coverage
Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.
Get 2-3 written estimates that itemize labor, materials, and timeline
Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.
Check permit requirements with City of White Plains Building Department ((914) 422-1269)
Permit applications accepted 9 AM–1 PM weekdays. Located at 70 Church St. NYS requires permits for most work.
Ask for 3 recent local references and actually call them
Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?
Verify contractor credentials: NY Division of Licensing Services
Best Time to Hire a Kitchen Remodeling Pro in New York
Seasonal timing guide for the Northeast (CT/NY metro area).
Start now to finish before summer entertaining season. Cabinet lead times are 4-8 weeks, so order in March for a May start. Countertop fabricators are less backed up than summer.
Peak demand season with longer wait times. Living without a kitchen is more tolerable when you can grill outside. Expect 8-12 week timelines for full remodels.
Good time to start — aim to finish before the holidays. Contractors are wrapping outdoor projects and have more availability for interior work.
Contractors are hungriest for work — best prices and fastest starts. Downside: living without a kitchen in winter is less comfortable. January is ideal for planning and ordering materials.
Free Quotes
From verified contractors
Credentials
Is this your business?
Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.
Claim This Listing