GNP Roofing & Siding

GNP Roofing & Siding

Siding·7 Chester Court, Huntington, New York 11743
5.0
5.0
(125)
This is an unclaimed listing. Information may be incomplete.

About GNP Roofing & Siding

GNP Roofing & Siding is a family-owned roofing and exterior contracting business serving Long Island, specifically Suffolk and Nassau Counties. With over 30 years of experience, they specialize in roofing, siding, window, and gutter services for residential and commercial properties, and pride themselves on having the owner personally oversee each project.

Listing last verified March 2026. Information sourced from public records and Google Business data.

Siding Services

Roof repairRoof replacementNew roof installationFlat roof installationShingle roof installation

siding services offered in Orangetown:

  • Roof Repair
  • Roof Replacement
  • New Roof Installation
  • Flat Roof Installation
  • Shingle Roof Installation
  • Vinyl siding installation and repair
  • Fiber cement (Hardie Board) installation
  • Wood siding repair and replacement

Siding in Orangetown — FAQ

How much does new siding cost in Orangetown?

New siding in Orangetown costs $9-$18 per sq ft, with the average project at $15,000. Vinyl siding is most common in Rockland's subdivisions. Hardie board gaining popularity for its durability.

What siding material is best for Orangetown?

For Orangetown's Split-Level and Colonial homes (median value $585,000), fiber cement (James Hardie) is the top choice—it handles New York's freeze-thaw cycles well and offers 30-50 year durability. Cedar suits historic homes, while vinyl is the most budget-friendly.

How long does siding last in Orangetown?

Vinyl siding lasts 20-40 years, fiber cement 30-50 years, and cedar 20-40 years with maintenance. New York's weather cycles can reduce lifespan if siding isn't properly installed.

Before Hiring a Siding Pro in Orangetown

Use this checklist to vet contractors before signing a contract.

  • Ask about housewrap and weather barrier installation behind the siding

    Siding alone is not waterproof. A continuous weather barrier (Tyvek, ZIP System) must be installed properly to prevent moisture intrusion.

  • Verify they follow the manufacturer's installation specifications

    Improper installation voids the siding warranty. James Hardie fiber cement, for example, has specific fastener and gap requirements.

  • Ask whether the quote includes soffit, fascia, and trim — or just field siding

    Trim, corners, and soffit add 20-40% to the cost. Some contractors quote field siding only and present trim as extras later.

  • Verify Home Improvement Contractor license with your municipality

    New York counties require Home Improvement Contractor registration. Check with your local clerk's office or building department.

  • Confirm general liability insurance and workers' compensation coverage

    Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.

  • Get 2-3 written estimates that itemize labor, materials, and timeline

    Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.

  • Check permit requirements with Town of Orangetown Building Department ((845) 359-8410)

    Contact town hall for permit requirements. Town includes Tappan, Pearl River, Blauvelt, Orangeburg, and Palisades hamlets.

  • Ask for 3 recent local references and actually call them

    Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?

Verify contractor credentials: NY Division of Licensing Services

Best Time to Hire a Siding Pro in New York

Seasonal timing guide for the Northeast (CT/NY metro area).

SpringMar - May
Best time

Best time to schedule. Mild temps allow comfortable installation. Vinyl siding needs 40°F+ to remain flexible. Book early — siding crews fill up by June.

SummerJun - Aug
Good time

Good installation conditions but peak demand. Vinyl expands in heat, so installers must leave proper expansion gaps. Fiber cement is unaffected by temperature.

FallSep - Nov
Good time

Last window before winter. Finish before sustained temps drop below 40°F. Caulk and sealant need above-freezing temps to cure. October is the practical cutoff.

WinterDec - Feb
Off-season

Vinyl becomes brittle below 40°F and cracks during installation. Fiber cement can be installed in cold weather but caulking and flashing are compromised. Emergency repairs only.

Free Quotes

From verified contractors

Your info is only shared with contractors you choose to contact.

By submitting, you agree to receive calls/texts from contractors

Credentials

30+ Years

Is this your business?

Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.

Claim This Listing