DKB Design
About DKB Design
DKB Design is a premier kitchen remodeling company that specializes in providing high-quality cabinetry, countertops, tiles, and accessories for luxury kitchen projects. With a large showroom located in New Rochelle, NY, they offer a wide selection of products and work closely with clients to bring their kitchen visions to life.
Listing last verified March 2026. Information sourced from public records and Google Business data.
Kitchen Remodeling Services
kitchen remodeling services offered in New Rochelle:
- Furniture_store
- Home_improvement_store
- Home_goods_store
- Store
- Kitchen Remodeling
- Cabinetry
- Countertops
- Tiles
Kitchen Remodeling in New Rochelle — FAQ
How much does a kitchen remodel cost in New Rochelle?
Kitchen remodels in New Rochelle average $62,000, ranging from $45,000-$85,000 per project. Custom cabinetry and imported materials are standard in Westchester kitchens. Expect $335+ per sq ft for mid-grade work.
How long does a kitchen remodel take in New Rochelle?
A typical kitchen remodel in New Rochelle takes 8-12 weeks. Complex projects with custom cabinetry or structural changes can take 16-20 weeks. Plan for cabinet lead times of 6-10 weeks.
Do I need permits for a kitchen remodel in New Rochelle?
Most kitchen remodels in New Rochelle require permits from the City of New Rochelle Building Department ((914) 654-2035), especially when changing plumbing, electrical, or removing walls. New Rochelle's Colonial-style homes, built around 1954, often benefit from opening up kitchens to modern open-concept layouts.
What kitchen layout works best for New Rochelle's Colonial homes?
Colonial homes in New Rochelle typically have enclosed, galley-style kitchens. Homes from the 1954s era usually have load-bearing walls separating the kitchen from dining areas, so opening up the floor plan requires an engineer's sign-off and a properly sized header beam ($2,000-$5,000 for the structural work alone). Popular upgrades include quartz countertops ($50-$120/sqft installed), soft-close cabinetry, and under-cabinet LED lighting.
Before Hiring a Kitchen Remodeling Pro in New Rochelle
Use this checklist to vet contractors before signing a contract.
Ask whether they handle design in-house or subcontract it
Some kitchen remodelers are also designers. Others outsource design, which adds a layer of coordination and potential miscommunication.
Confirm they will create a detailed layout before ordering cabinets
Cabinet lead times are 4-8 weeks. Measuring errors are expensive. A professional layout should include appliance dimensions and clearances.
Ask about material allowances versus fixed specifications
Bids with vague 'allowances' for countertops or fixtures can balloon. Get specific product selections and prices in the contract.
Verify plumbing and electrical subcontractors are licensed
Kitchen remodels involve gas lines, electrical circuits, and plumbing. These must be done by licensed tradespeople, even if the GC manages the project.
Verify Home Improvement Contractor license with your municipality
New York counties require Home Improvement Contractor registration. Check with your local clerk's office or building department.
Confirm general liability insurance and workers' compensation coverage
Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.
Get 2-3 written estimates that itemize labor, materials, and timeline
Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.
Check permit requirements with City of New Rochelle Building Department ((914) 654-2035)
Located at City Hall, 515 North Ave. Online permit system available at newrochelleny.gov.
Ask for 3 recent local references and actually call them
Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?
Verify contractor credentials: NY Division of Licensing Services
Best Time to Hire a Kitchen Remodeling Pro in New York
Seasonal timing guide for the Northeast (CT/NY metro area).
Start now to finish before summer entertaining season. Cabinet lead times are 4-8 weeks, so order in March for a May start. Countertop fabricators are less backed up than summer.
Peak demand season with longer wait times. Living without a kitchen is more tolerable when you can grill outside. Expect 8-12 week timelines for full remodels.
Good time to start — aim to finish before the holidays. Contractors are wrapping outdoor projects and have more availability for interior work.
Contractors are hungriest for work — best prices and fastest starts. Downside: living without a kitchen in winter is less comfortable. January is ideal for planning and ordering materials.
Free Quotes
From verified contractors
Is this your business?
Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.
Claim This Listing