Carbone Brothers Kitchens, Baths, Fine Cabinetry & Stone Fabricators

Carbone Brothers Kitchens, Baths, Fine Cabinetry & Stone Fabricators

Kitchen Remodeling·2043 Albany Post Road, Croton-on-Hudson, New York 10520
4.7
4.7
(12)
This is an unclaimed listing. Information may be incomplete.

About Carbone Brothers Kitchens, Baths, Fine Cabinetry & Stone Fabricators

Carbone Brothers Kitchens, Baths, Fine Cabinetry & Stone Fabricators is a family-owned business that has been providing high-quality kitchen and bathroom renovations, custom cabinetry, and stone fabrication services for over 50 years. Founded in 1960 by Pasquale Carbone, the company continues to be led by Pasquale, his wife Angela, their son Anthony, and their family employees, delivering exceptional craftsmanship and customer service.

Listing last verified March 2026. Information sourced from public records and Google Business data.

Kitchen Remodeling Services

Furniture StoreHome Improvement StoreHome Goods StoreGeneral ContractorStoreKitchen renovationsBathroom renovationsCustom cabinetryStone fabrication (granite, marble, quartz)

kitchen remodeling services offered in Croton-on-Hudson:

  • Furniture_store
  • Home_improvement_store
  • Home_goods_store
  • General_contractor
  • Store
  • Kitchen Renovations
  • Bathroom Renovations
  • Custom Cabinetry

Kitchen Remodeling in Croton-on-Hudson — FAQ

How much does a kitchen remodel cost in Croton-on-Hudson?

Kitchen remodels in Croton-on-Hudson average $62,000, ranging from $45,000-$85,000 per project. Custom cabinetry and imported materials are standard in Westchester kitchens. Expect $335+ per sq ft for mid-grade work.

How long does a kitchen remodel take in Croton-on-Hudson?

A typical kitchen remodel in Croton-on-Hudson takes 8-12 weeks. Complex projects with custom cabinetry or structural changes can take 16-20 weeks. Plan for cabinet lead times of 6-10 weeks.

Do I need permits for a kitchen remodel in Croton-on-Hudson?

Most kitchen remodels in Croton-on-Hudson require permits from the Village of Croton-on-Hudson Building Department ((914) 271-4783), especially when changing plumbing, electrical, or removing walls. Croton-on-Hudson's Colonial-style homes, built around 1952, often benefit from opening up kitchens to modern open-concept layouts.

What kitchen layout works best for Croton-on-Hudson's Colonial homes?

Colonial homes in Croton-on-Hudson typically have enclosed, galley-style kitchens. Homes from the 1952s era usually have load-bearing walls separating the kitchen from dining areas, so opening up the floor plan requires an engineer's sign-off and a properly sized header beam ($2,000-$5,000 for the structural work alone). Popular upgrades include quartz countertops ($50-$120/sqft installed), soft-close cabinetry, and under-cabinet LED lighting.

Before Hiring a Kitchen Remodeling Pro in Croton-on-Hudson

Use this checklist to vet contractors before signing a contract.

  • Ask whether they handle design in-house or subcontract it

    Some kitchen remodelers are also designers. Others outsource design, which adds a layer of coordination and potential miscommunication.

  • Confirm they will create a detailed layout before ordering cabinets

    Cabinet lead times are 4-8 weeks. Measuring errors are expensive. A professional layout should include appliance dimensions and clearances.

  • Ask about material allowances versus fixed specifications

    Bids with vague 'allowances' for countertops or fixtures can balloon. Get specific product selections and prices in the contract.

  • Verify plumbing and electrical subcontractors are licensed

    Kitchen remodels involve gas lines, electrical circuits, and plumbing. These must be done by licensed tradespeople, even if the GC manages the project.

  • Verify Home Improvement Contractor license with your municipality

    New York counties require Home Improvement Contractor registration. Check with your local clerk's office or building department.

  • Confirm general liability insurance and workers' compensation coverage

    Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.

  • Get 2-3 written estimates that itemize labor, materials, and timeline

    Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.

  • Check permit requirements with Village of Croton-on-Hudson Building Department ((914) 271-4783)

    Contact village hall for permit requirements. Flood zone properties near the Hudson require elevation certificates.

  • Ask for 3 recent local references and actually call them

    Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?

Verify contractor credentials: NY Division of Licensing Services

Best Time to Hire a Kitchen Remodeling Pro in New York

Seasonal timing guide for the Northeast (CT/NY metro area).

SpringMar - May
Best time

Start now to finish before summer entertaining season. Cabinet lead times are 4-8 weeks, so order in March for a May start. Countertop fabricators are less backed up than summer.

SummerJun - Aug
Good time

Peak demand season with longer wait times. Living without a kitchen is more tolerable when you can grill outside. Expect 8-12 week timelines for full remodels.

FallSep - Nov
Best time

Good time to start — aim to finish before the holidays. Contractors are wrapping outdoor projects and have more availability for interior work.

WinterDec - Feb
Good time

Contractors are hungriest for work — best prices and fastest starts. Downside: living without a kitchen in winter is less comfortable. January is ideal for planning and ordering materials.

Free Quotes

From verified contractors

Your info is only shared with contractors you choose to contact.

By submitting, you agree to receive calls/texts from contractors

Credentials

62+ Years

Is this your business?

Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.

Claim This Listing