Aries Electric L.L.C.

Aries Electric L.L.C.

Electrical·619 Judd Road, Easton, Connecticut 06612
4.4
4.4
(7)
This is an unclaimed listing. Information may be incomplete.

About Aries Electric L.L.C.

Aries Electric L.L.C. is a professional electrical service provider offering a wide range of services for residential, commercial, and industrial clients. They have a team of highly-trained, industry-certified master electricians with years of experience to ensure quality work.

Listing last verified March 2026. Information sourced from public records and Google Business data.

Electrical Services

ElectricianService UpgradesSolar InstallationsPools and SpasKitchen and BathsCommercialResidential and Industrial

electrical services offered in Easton:

  • Electrician
  • Service Upgrades
  • Solar Installations
  • Pools and Spas
  • Kitchen and Baths
  • Commercial
  • Residential and Industrial
  • Electrical panel upgrades and replacements

Electrical in Easton — FAQ

How much does an electrician cost in Easton?

Electricians in Easton charge $140-$260 per hour. The average electrical project runs about $4,500. High-end smart home integrations and EV charger installations are common in Fairfield County's luxury market.

Do I need a permit for electrical work in Easton?

Yes, most electrical work in Easton requires a permit from the Town of Easton Building Department ((203) 268-6291). Your licensed electrician should handle the permit application and schedule required inspections.

Can an electrician install an EV charger at my Easton home?

Yes, licensed electricians in Easton regularly install Level 2 EV chargers. Installation typically requires a dedicated 240V circuit and may need a panel upgrade. Cost ranges from $500-$2,000 for installation.

Before Hiring a Electrical Pro in Easton

Use this checklist to vet contractors before signing a contract.

  • Verify master electrician license, not just journeyman

    A master license means they can design systems and pull permits independently. Journeymen must work under a master.

  • Ask about experience with panel upgrades to 200A service

    Older homes in the region often have 100A panels. EVs, heat pumps, and modern kitchens frequently require a 200A upgrade.

  • Confirm they perform a load calculation before quoting panel or circuit work

    Proper load calculations prevent under-sized circuits and tripped breakers. A contractor who skips this step is cutting corners.

  • Ask if they install whole-house surge protection as part of panel work

    A $200-$400 surge protector at the panel can save thousands in appliance damage during Northeast storms.

  • Verify HIC registration with the CT Department of Consumer Protection

    Connecticut requires all home improvement contractors to register with the DCP. Verify at portal.ct.gov/DCP.

  • Confirm general liability insurance and workers' compensation coverage

    Ask for a certificate of insurance (COI) naming you as additionally insured. Workers' comp protects you if a worker is injured on your property.

  • Get 2-3 written estimates that itemize labor, materials, and timeline

    Lump-sum quotes hide details. Itemized estimates let you compare apples to apples and catch hidden costs.

  • Check permit requirements with Town of Easton Building Department ((203) 268-6291)

    Contact town hall for permit requirements. Easton has no public water or sewer — all properties use private well and septic.

  • Ask for 3 recent local references and actually call them

    Ask references specifically: Did the job finish on time and on budget? Were there surprises? Would you hire them again?

Verify contractor credentials: CT Dept. of Consumer Protection

Best Time to Hire a Electrical Pro in Connecticut

Seasonal timing guide for the Northeast (CT/NY metro area).

SpringMar - May
Best time

Ideal for panel upgrades and outdoor lighting projects before summer. Schedule your EV charger or heat pump circuit installation now to avoid summer backlog.

SummerJun - Aug
Good time

Busiest season for AC-related electrical work and new construction. Generator installations peak before hurricane season. Book 3-4 weeks ahead.

FallSep - Nov
Good time

Last chance for outdoor electrical projects before ground freezes. Generator demand spikes after the first power outage. Interior rewiring is comfortable year-round.

WinterDec - Feb
Best time

Interior work (panel upgrades, rewiring, smart home installation) is unaffected by weather. Electricians are less busy — often the shortest wait times and best availability.

Free Quotes

From verified contractors

Your info is only shared with contractors you choose to contact.

By submitting, you agree to receive calls/texts from contractors

Is this your business?

Claim it to edit your info. Upgrade to Featured for $49/mo to appear first.

Claim This Listing